The Fifth Desk · Evaluation
Act I · The Map
Toyo Ito · an opera house and public building · a rectangular block whose interior is a structure of continuous curved concrete walls passing through the floors and forming linked, tube-like voids, so that wall, floor and ceiling are one surface; the box-like envelope cut open where the curved sections meet the façade · three halls, a large theatre, a middle-sized playhouse and a small black box, set within the curved structure, with public foyers and circulation between the walls and a garden on the roof · Taichung, Taiwan · built 2009 to 2016 to the design of Toyo Ito, opened in 2016 after a long construction · scored as the opera house as built, about ten years in use
Mode
Opera house and public building: three halls set within a continuous curved-wall structure, inside a rectangular envelope, with a roof garden
Mythos
The cave, first shelter and first theatre, the hollow where sound gathers and the rite is performed; built and literally load-bearing, and stopping at the threshold of the halls
Phase
Built 2009 to 2016 after a long construction; opened in 2016; in use about ten years as the city’s opera house
Presentation
Curved concrete walls continuous through several floors, white surfaces carrying light; a rectangular envelope cut where the curves meet it; three halls of conventional form within; a roof garden
Register
Strange and strong in the public spaces, a hollowed body in a modern city, sometimes nearer spectacle than transport; striking from outside at night
Scale
The performing arts and their public, the city given a public interior and a raised garden, the natural order as an image of cave and organism, and technology in the structure
Governing Proposition
A Taiwanese city builds an opera house, and its architect makes the inside of the building a cave: curved concrete walls that rise continuously through the floors, open into one another and carry the whole, so that wall, floor and ceiling become one surface and the foyers are the hollows between them. The wager is that a large public building can be a continuous, porous interior without right angles, through which people move as through a cave or a body, and that a structure no standard formwork could make can be built. The cave was built; the halls it leads to are rooms of the ordinary kind, set inside it.
Act II · The Essay
Movement I
Taichung, in Taiwan, built an opera house in its new civic centre, and Toyo Ito designed it. Construction ran from 2009 to 2016, long for a building of its size, and it opened in 2016. It holds three halls, a large theatre, a middle-sized playhouse and a small black box, with public foyers between them and a garden on the roof.
The work scored is the opera house as built: the rectangular block, its curved-wall structure, its three halls, its foyers and circulation, and the roof garden. The park and civic district around it are context, and so are the productions staged in it. So is Ito’s earlier work, above all the Sendai Mediatheque (8.1), whose tubes rising through thin floors stand behind this building.
The inheritance was the modern opera house as a set of boxes in a monumental envelope, as at the Bastille in Paris and in Oslo, and its expressive variants, Sydney and the Casa da Música. Ito set out to make something else: a building whose whole interior is a cave.
Movement II
The structure is a field of curved concrete walls that pass continuously through the floors and form linked, tube-like voids. Wall, floor and ceiling are one surface. The walls are not set inside the building; they are the building, and remove them and nothing stands. The foyers, stairs and passages are the hollows between them.
Ito named the idea a cave of sound, and the name is built. The cave is the first shelter and the first theatre, the hollow in the earth where sound gathers and the rite is performed, and here it is structural rather than an image. The particular is kept: a public building in a Taiwanese city, its cave cut open at the façade and planted on top.
The claim the building makes is that a public interior can be continuous and porous, without walls and floors at right angles, so that the people of the city move through it as through a cave or a body and the edges of hall, foyer and street dissolve. It makes the claim plainly, and it builds it. Whether the public lives it so, ten years is short to say.
Movement III
No standard formwork could make these walls. They rise through several floors, swelling and narrowing, and a method of construction had to be devised to build them. The building took years. The making is load-bearing in the strict sense: the difficulty was the design, and it was carried through.
The departure was Ito’s, and the stake was real: the whole interior of a large public building made as one curved surface, at once wall, floor and structure, in reinforced concrete. The cave-space had precedents in his own unbuilt work and in others’, and here it was built. It proved that such an interior could be made at the scale of an opera house.
Its reach is not yet shown. The free-form architecture of the decade was moving in many directions, more often in steel and glass than in concrete, and no clear line of buildings has taken this one as a model. Its reach so far is to builders and to its architect’s standing, and that cannot be credited in advance.
Movement IV
The cave is held inside a box. The envelope is a rectangle, and where the curved sections meet it the façade is cut open, so that the dark hollows show in the glass and white of the block, most strikingly at night. The rectangle is a frame chosen, not required, and its meeting with the curves is a deliberate collision.
The halls are rooms of the ordinary kind. The large theatre has its stage house and fly tower, rectilinear, set into the flowing cave; the playhouse and the black box are likewise conventional rooms. The purpose of an opera house is served by them, and the cave is the space one walks through to reach them. The myth stops at the threshold of the rite it invokes, and the swerve stops there too.
So the building obeys two laws. The curved surface governs the public interior, consistently and across a wide range of spaces; the box governs the envelope and the halls. The order is strong and partial, broken where the programme required boxes. Much of the curved circulation could be otherwise without loss to the halls, and that is the measure of how far the cave is required by the building’s purpose rather than by its idea.
Movement V
To walk up through the building is to move through a hollowed body in a modern city: the white walls rise through the floors and open into one another, lit from the cuts in the box, carrying light round their curves. The elevation comes at many points, sometimes nearer spectacle than transport. At the top the public ground continues as a garden on the roof. The building holds the performing arts and their public, the city given a public interior, the natural order as an image of cave and organism, and the technology of its structure. The state, history, labour and the sacred are not in it.
It has been in use for about ten years, its form whole, its use continuous as the city’s opera house. It is visited and photographed heavily and studied for its structure, and its return can only be forecast; how its concrete and white surfaces will age is not yet known. The Sendai Mediatheque (8.1) stands half a tier above it. Among opera houses and concert halls of its decades, the Oslo Opera House (7.9), the Elbphilharmonie (7.8) and the Casa da Música (7.8) stand just above, and Walt Disney Concert Hall (7.8) beside them.
The National Taichung Theater stands at 7.6, in Tier III. What holds it there is plain: a cave required by its idea more than by its purpose, a disclosure of atmosphere more than of a way of living, a myth that stops at the doors of the halls, a reach not yet shown, and a survival not yet long. What carries it within its tier is equally plain: a swerve taken and built at real cost, a structure no standard formwork could make, and public spaces that rise through the floors and open, one into another.
Act III · The Twelve
Judged on purpose, structure and site. The curved walls are the structure: remove them and nothing stands, and the foyers, stairs and passages are the spaces between them, so the idea is required by itself. But the purpose of an opera house, rooms for hearing and seeing performance with their stages and back of house, is served by conventional rooms set within the cave, and the cave’s forms are permitted by that purpose rather than compelled by it. Much of the curved circulation could be otherwise without loss to the halls, and the rectangle that cuts the caves at the façade is a frame chosen, not required. A necessity of concept carried through, less of purpose; it falls a tenth short of the cap.
Score: 7.4 / 10
What can be stated, and holds: a public building can be a continuous, porous interior, without floors and walls at right angles, in which the city’s people move as through a cave or a body, and the boundaries of hall, foyer and street dissolve. Ito’s building makes that claim plainly and builds it. What holds the axis: the disclosure is largely of a spatial condition, an atmosphere of flow and enclosure, more than of a way of living whose consequences can be stated and checked, and ten years is short to know whether the public lives it so. A mood ranks below a meaning, and this stands between them.
Score: 7.4 / 10
Elevation is frequent and strong in the public spaces. The curved walls rise through several floors and open into one another in voids lit from cuts in the box, the white surfaces carrying light round their curves; to walk up through them is to move through a hollowed body or a carved cave in a modern city. From outside, the dark sections of the caves cut into the glass and white of the box are striking at night. The sublime here is that of a strange interior, felt at many points. What holds it: the elevation sometimes reads as spectacle rather than transport, and it belongs to the foyers rather than to the halls, where the building’s purpose lies.
Score: 8.1 / 10
The archetype is built, and literally load-bearing: the cave, the first shelter and first theatre, the hollow in the earth where sound gathers and the rite is performed. Ito named the idea so, and the structure is the cave, not an image of it. The particular is kept: a public building in a Taiwanese city, with a garden on its roof. What holds the axis well short of the bar is that the archetype, though structural, is not shaped into a meaning beyond itself. The cave is the space one walks through to reach the conventional halls, not the room where the performance happens, so the myth stops at the threshold of the rite it invokes.
Score: 7.7 / 10
The inheritance: the modern opera house as a set of boxes in a monumental envelope, as at the Bastille in Paris and in Oslo; its expressive variants, Sydney and the Casa da Música; and Ito’s own line from the tubes of the Sendai Mediatheque. The departure: to make the whole interior of a large public building a continuous curved surface that is at once wall, floor and structure, a space without right angles through several storeys, built in reinforced concrete. The stake was great: a construction method had to be made for it, and the building took years to raise. The turn is Ito’s and was risked. What holds it a tenth short of the bar: the idea of the cave-space had precedents in his own and others’ unbuilt work, and the halls are not part of the swerve.
Score: 8.4 / 10
Would a different form change what the building does? In the public spaces, yes: the caves make movement through the house a continuous, unfolding passage rather than a sequence of lobbies and stairs, and the building’s knowledge, that a public interior can be fluid and porous, is its form. The roof garden extends the public ground upward. In the halls, less: they are conventional rooms whose form owes little to the cave around them, so that performance, the building’s purpose, is not lived differently because of it. Form is the instrument in half the building, and that holds the axis.
Score: 7.8 / 10
Evidence over promise, over about ten years. The building has been studied in architectural and engineering writing as a case of curved-surface structure and of the method devised to build it, and in writing on Ito’s work; it is visited and photographed heavily, and it appears to reward return, the interior changing as one moves. What holds it lowest of the eleven axes the Universal Minimum governs: the axis is evidentiary and a decade is short, so the return can only be forecast, and the questions raised so far are of construction and form rather than of meaning.
Score: 7.0 / 10
Scored in the field of the public and cultural building of East Asia and the world in the 2010s. Intrinsic force: high, a continuous curved structure built at the scale of an opera house, proving that an interior of that kind could be made in concrete. Achieved reach is scored with intrinsic force: not yet shown. In a decade no clear line of buildings has taken it as a model, and the free-form architecture of the period was moving in many directions at once, more often in steel and glass than in concrete. Its reach so far is to the construction community and to its architect’s standing, and reach cannot be credited in advance.
Score: 7.4 / 10
Weighed on form, then use, then fabric, over about ten years. The form survives whole, as built; the use has been continuous since 2016, as the city’s opera house and a public building; the fabric is new. A building under thirteen years old cannot stand high on this axis, whatever its promise. Its presence is wide among architects and in the region, but not general. The surface is of its moment, the free-form interior of the 2010s, and how its concrete and white surfaces will age is not yet known. That holds the figure here.
Score: 7.8 / 10
Judged as command of building, structure included. The making was difficult and was carried through: curved walls continuous through several floors, built by a method devised for them, so that a structure no standard formwork could make was made. That method is load-bearing in the strict sense, and it is the building’s strongest achievement of craft. What holds the figure: the halls are conventionally made, the long construction points to a design that strained the means available, and the quality of the finish and of the halls’ acoustics is not known well enough to credit.
Score: 8.2 / 10
Take the two most distant elements: the flowing white cave of the foyers and the rectilinear stage house and fly tower of the large theatre. They obey different laws. The curved surface governs the public interior; the box governs the envelope and the halls; and their meeting at the façade, where the rectangle slices the caves, is a deliberate collision rather than one law. Within the cave the law is consistent, and the range of spaces it makes is wide. What holds the axis: a strong partial order, broken where the programme required boxes, the collision legible and intended but not resolved.
Score: 7.7 / 10
The orders held: the performing arts and their public; the city, given a public interior and a raised garden; the natural order, as an image of cave and organism and in the planting of the roof; and technology, in the structure. They are integrated in one structure to a degree, the cave carrying public, art and nature together. What holds the axis lowest of the twelve: the state, history, labour and the sacred are absent or incidental, and consciousness is addressed only as the bodily experience of space. A middle mark for a large building that holds few orders.
Score: 6.8 / 10
Act IV · The Reckoning
7.6 / 10 · Final Average
Placement: Tier III · Major
Strongest Dimensions
The Swerve at 8.4, then The Made at 8.2 and The Sublime at 8.1. The whole interior of an opera house made one continuous curved surface of wall, floor and structure, at real cost; walls no standard formwork could make, raised by a method devised for them; and public spaces that rise through several floors and open into one another, lit round their curves.
Limiting Dimension
The Encompassed at 6.8: the performing arts, a public interior, a roof garden and a structure, with the state, history, labour and the sacred absent. Then The Bottomless Well at 7.0: a return that ten years can only forecast. Then The Inevitable, The Unconcealment and Pressure on Tradition at 7.4: a cave required by its idea more than by its purpose, a disclosure of atmosphere more than of a way of living, and a reach not yet shown. These hold the work below Tier IV.
The Necessity Cap is unmet: The Inevitable at 7.4 falls a tenth short of the threshold of 7.5. The Coherence Floor clears: The Living Form at 7.8, The Made at 8.2, The Inner Law at 7.7, each against 7.0. The Epochal Gate is unmet on all five: The Swerve at 8.4 falls a tenth short of the bar of 8.5, The Imperishable at 7.8 seven tenths short, The Archetypal Deep at 7.7 eight tenths short, and The Unconcealment and Pressure on Tradition at 7.4 short by 1.1. The Universal Minimum is unmet at The Bottomless Well, 7.0, and at The Inevitable, The Unconcealment and Pressure on Tradition, 7.4, all below 7.5; The Encompassed, which it exempts, clears its own floor of 6.0 at 6.8. Two of the five summit conditions are met, the Coherence Floor and the Megethos Floor. The work stands where its aggregate places it: the twelve sum to 91.7, an average of 7.64 that displays 7.6, in the band of Tier III, four tenths short of the 8.0 at which Tier IV begins and short of the 9.0 that the summit requires.
Basis · a reading from knowledge of the building as built: its architect, its dates, its governing idea of continuous curved walls passing through the floors, its envelope, its three halls and its roof garden are held with confidence; its construction method in outline only, and its use and acoustics thinly. No visit was made, no plan or section was in hand and nothing was measured. Nothing is quoted. The unit scored is the National Taichung Theater as built, Taichung, Taiwan, 2009 to 2016: the rectangular block, the curved-wall structure, the three halls, the foyers and circulation, and the roof garden. Not in the unit, named as context and not scored: the park and civic district around it, the productions staged in it, and Ito’s earlier work. Facts that could not be verified are not given, among them the year of the competition, the seating of each hall, the number and geometry of the curved walls, the details of the method by which they were built, the course of the tendering and the cost, the hours the public spaces are open, the finish of the surfaces and the acoustic quality of the halls.